Empowering the energy storage industry, Jingcheng Industrial provides a full-process high-voltage connection solution for an energy storage enterprise.

Cooperation Background

As a major domestic energy storage equipment manufacturer, the company has undertaken multiple large-scale energy storage power station projects. Its energy storage modules need to adapt to high-voltage and high-current connection scenarios, imposing extremely high requirements on connectors for high-voltage resistance (up to 1500V), high-current carrying capacity (100A–200A), and insulation performance. The connectors must also meet operational demands in outdoor high-temperature and humid environments. In addition, the project faced a tight delivery schedule requiring rapid mass production. With its comprehensive new energy solutions, Jingcheng Industrial won the bid successfully.

Cooperation Content

Jingcheng Industrial provided a full-process high-voltage connection solution. Core products include high-voltage connector pin and socket assemblies for new energy applications, high-current Pogo Pins (supporting 100A–200A), dedicated connector assemblies for energy storage equipment, and supporting CNC precision machined parts. High-temperature-resistant and flame-retardant materials are adopted, with optimized insulation structures delivering excellent anti-leakage and anti-arcing performance. The products feature convenient plugging and unplugging, low contact resistance, reduced energy loss, and adaptability to complex outdoor working conditions in energy storage power stations.

Technical & Digital Support

The digital R&D team used simulation technology to optimize product structure, improve heat dissipation and insulation performance, and shorten the R&D cycle. The digital production system realized automated assembly and inspection of high-voltage components, eliminating human errors, increasing production efficiency by more than 30%, and ensuring consistency of mass-produced products. A rapid supply channel was established, supported by a digital scheduling system to ensure on-time delivery of bulk project orders. Meanwhile, high-voltage performance testing services were provided to ensure products comply with new energy industry standards.

Cooperation Achievements

Jingcheng Industrial completed mass supply for the energy storage power station projects on schedule. After testing, the products fully met high-voltage and high-current connection requirements, exhibited excellent insulation performance, and operated stably without failures under complex outdoor conditions, supporting the smooth grid connection of multiple large-scale energy storage power stations.

With professional solutions, stable product quality and efficient delivery capacity, we established a long-term strategic cooperation with the energy storage enterprise and continue to provide high-voltage connection solutions for its energy storage projects, with a steady growth in annual order volume. Relevant technologies have also been adapted to connection demands in other new energy fields such as photovoltaic and wind power.